IRRIGATION SECTOR
Construction of Minor Karkan Kartar Pur Chak 177 to Kartar Pur, Nankana Sahib.
Cost: PKR 357.13 million | Status: Approved
ENERGY SECTOR
Hiring of Consultants for Review / Updation of Request for Proposal (RFP) and Feasibility Study for Selection of Sponsor(s) for 120 MW Taunsa Hydropower Project. (PC-II)
Cost: PKR 56.462 million | Status: Deferred
URBAN DEVELOPMENT SECTOR
Extension of Water Facilities in Extended Controlled Area recently notified by Punjab Government.
Cost: PKR 250.523 million | Status: Approved
Provision of Sewerage System for UC-117, 118, & 120, Lahore.
Cost: PKR 7610.873million | Status: Approved
Construction of Flyover at Katcha Jail Road Crossing and Improvement of At-Grade Road Network, Lahore.
Cost: PKR 1052.685 million | Status: Approved
Replacement of Outlived Rusty & Leaking Pipelines and Extension of Distribution System (New) in leftover areas with Allied Works in WASA Jurisdiction, Rawalpindi (Gastro Project Phase-II)
Cost: PKR 499.794 million | Status: Approved
PPH SECTOR
P.C.C. and Drainage Scheme Theing More / Illahi Abad Tehsil Chunian District Kasur.
Cost: PKR 256.672 million | Status: Deferred
Urban Water Supply Scheme Muridke District Sheikhupura.
Cost: PKR 450.000 million | Status: Deferred
Water Supply Scheme Fazaiya Housing Colony Turnol, Tehsil and District Rawalpindi.
Cost: PKR 374.680 million | Status: Approved
LIVESTOCK SECTOR
Establishment of University of Veterinary and Animal Sciences at Bahawalpur. (Revised)
Cost: PKR 2943.013 million | Status: Approved
TOURISM SECTOR
Lahore Tourist Bus Service (Revised).
Cost: PKR 239.378 million | Status: Approved
Feasibility Study for Installation of Cable Cars Murree (Phase-I) (Revised). (PC-II)
Cost: PKR 243.303 million | Status: Deferred
PUBLIC BUILDING SECTOR
Construction of Punjab Police Integrated Command, Control & Communication (PPIC3) Centre at Qurban Lines, Lahore.
Cost: PKR 605.630 million | Status: Approved
ROADS SECTOR
Construction of Bridge Over River Ravi for Metro Bus System.
Cost: PKR 664.051 million | Status: Not Discussed
Augmentation of Mechanized Unit for Snow Clearance of Murree Hills District Rawalpindi (Purchase of Snow Clearance Machines for Year 2015-16).
Cost: PKR 347.960 million | Status: Not Discussed
Widening / Improvement of metalled road from Adda Sardarpur to Sial Machine, (Remaining Portion) length=14.36 km, Khanewal.
Cost: PKR 212.064 million | Status: Not Discussed
Widening / Improvement of road (Remaining Portion) Dewalian to Dhoke Tahlian length= 8.00 km i/c Construction of link road from Dewalian to Thal Chak L = 5.50 Km and Const. of Bridge (with approaches) over Bunnah Nullah on Dewalian Segal Abad Road L = 1.13 kms total length = 14.63 km District Chakwal.
Cost: PKR 238.685 million | Status: Not Discussed
Construction & Extension of W/I of Pattan Minara Manthar Road (length:26.25 Km), R.Y. Khan.
Cost: PKR 338.453 million | Status: Not Discussed