HEALTH SECTOR
Establishment of 100 Bedded Tehsil Level Hospital at Manawan (Rakh Chabil) G.T. Road, Lahore
Cost: PKR 599.662 million| Status: Approved
UD SECTOR
Provision of Clean Drinking Water, Sewerage System, PCC and Allied Service Facilities in Sabzazar and Adjoining Abadies, in NA-121, WASA, LDA, Lahore.
Cost: PKR 500.089 million| Status: Approved
Provision of Clean Drinking Water, Sewerage System, PCC and Allied Facilities in Ravi Road, Islampura and Adjoining Abadies, Lahore.
Cost: PKR 494.326 million| Status: Approved
Provision of Clean Drinking Water, Sewerage System, PCC and Allied Facilities in Shimla Pahari and Adjoining Abadies, Lahore.
Cost: PKR 500.00 million| Status: Approved
ROADS SECTOR
Construction / Re-Construction of road from Banglow Sultan Pur to Noorewala Banglow via Vigh Langarwala Pull Jallah Bala Sahiba Banglow Awan Wala along Ghazni Rajbah, length 41.00 km, Sargodha.
Cost: PKR 632.788 million| Status: Approved
Rehabilitation of Dualized road from Sargodha to Makhdoom Interchange (M-2) length 42.00 km, Sargodha.
Cost: PKR 2224.781 million| Status: Approved
Widening / Improvement of road from Pandorian (M-3) Interchange to Shahkot via Sangla Hill (length 32.90 km), Nankana Sahib.
Cost: PKR 1305.874 million| Status: Approved
Rehabilitation of Nankana-Mangtanwala Road (length 17.00 km), Nankana Sahib.
Cost: PKR 701.483 million| Status: Approved
Widening / Improvement of Kotla Arab Ali Khan to Kharian (Carpeted Road) length=21.60 kms, Gujrat.
Cost: PKR 423.334 million| Status: Approved