46th PDWP

Livestock Sector

Establishment of University of Veterinary and Animal Sciences at Bahawalpur
Cost: PKR 2,771.9 million | Status: Deferred
 

Health Sector

Appointment of A Consultant for Baluchistan Institute of Cardiology, Quetta, Baluchistan.(PC-II)
Cost: PKR 33.162 million | Status: Deferred
 
Provision of Missing Specialties for Upgradation of DHQ Hospitals (AIMH & GSBH Sialkot) to Teaching Hospitals
Cost: PKR 3,657.37 million | Status: Deferred | ADP No. 390 (New)
 

Youth Affairs Sector

Punjab Youth Internship Program (Phase-II) (Revised)
Cost: PKR 1,286.83 million | Status: Approved
 

Industries Sector

Registration of Geographical Indications (3rd Revised)
Cost: PKR 99.55 million | Status: Approved | ADP No.1425
 

Irrigation Sector

Remodeling of SMB Link Canal and Enhancing Capacity of Mailsi Syphon, District Bahawalpur (Revised)
Cost: PKR  4,478.780 million | Status: Deferred | ADP No.962 (on-going)
 

Roads Sector

Lahore Ring Road Project Fencing / Barrier Wall / RCC Wall
Cost: PKR 212.107 million | Status: Approved
 
Lahore Ring Road (Package-11) Construction of Interchange at Ghazi Road
Cost: PKR 2,216.990 million | Status: Approved
 
Lahore Ring Road (Package-13) Construction of Road Portion from Mehmood Booti To Lakhu Dair
Cost: PKR  1,335.484 million | Status: Approved
 
Lahore Ring Road (Package-14) Construction of Road Portion from Ghazi Road Intersection to Bedian Road Intersection
Cost: PKR 1,977.680 million | Status: Deferred 
 
Construction of Additional Bridge over River Ravi (4-Lane), Lahore
Cost: PKR  1,159.833 million | Status: Deferred | ADP No.898 (on-going)
 
Construction of Flyover (Complete Signal-Free Interchange) at Aziz Cross on G.T. Road, Gujranwala
Cost: PKR  5,954.136 million | Status: Deferred | ADP No.765 (on-going)
 
Construction of Road and High Level Bridge Between District Mianwali and Jand, District Attock
Cost: PKR 2,164.294 million | Status: Approved
 
Dualization of Khanewal Lodhran Road length=98.00 km in District Khanewal / Vehari and Lodhran
Cost: PKR 8,061.155 million | Status: Approved
 
Construction of Metalled Road from Pull Dat (D.G. Khan City) to Kot Mubarak Via Kot Habait Chabri and Yaroo on Western Bank of Manka Canal Length=8.25 Km, District D.G. Khan. (Revised)
Cost: PKR 241.786 million | Status: Approved