INFORMATION TECH. SECTOR
Punjab Police Integrated Command, Control & Communication (PP-IC3) Programme.
Cost: PKR 13,387.679 million | Status: Approved
ARCHEOLOGY SECTOR
Preservation & Restoration of Shahdara Complex of Monuments (Revised).
Cost: PKR 467.990 million | Status: Approved
IRRIGATION SECTOR
Protection of Agricultural Land and Village Abadies near Daud Post / Village Daud Khas.
Cost: PKR 488.556 million | Status: Deferred
PUBLIC BUILDINGS SECTOR
Construction of District Jail, Lodhran.
Cost: PKR 1330.504 million | Status: Deferred
Construction of District Jail, Layyah. (Non-Residential Portion)
Cost: PKR 338.574 million | Status: Deferred
ROAD SECTOR
Lahore Ring Road Project – Southern Loop (Package-1) (Land Acquisition and Relocation of Utilities)
Cost: PKR 5425.595 million | Status: Approved
Lahore Ring Road Project – Southern Loop (Package-2) (Land Acquisition and Relocation of Utilities) (Revised)
Cost: PKR 9956.594 million | Status: Approved
Lahore Ring Road Project – Southern Loop (Package-3) (Land Acquisition and Relocation of Utilities)
Cost: PKR 5820.664 million | Status: Approved
Lahore Ring Road (Package-9) Construction of Interchange at Harbanspura Canal Crossing (Revised)
Cost: PKR 2376.215 million | Status: Approved
Improvement / Rehabilitation of Existing Multan Road, Lahore from Thokar Niaz Baig to Chauburji (Proposed Sewerage Drainage and Water Supply System) Package-III. (Revised)
Cost: PKR 2045.751 million | Status: Approved
Rehabilitation/Widening of 10’-12’ Rural Roads under “Khadem-e-Punjab Roads Programme (KPRP)” (South Zone)
Cost: PKR 8025.058 million | Status: Approved
Khadem-e-Punjab Roads Program (KPRP) (Rehabilitation & Widening of (Rural) Roads in Punjab Highways Department, North Zone) (Umbrella PC-I) (Revised)
Cost: PKR 9892.000 million | Status: Approved
Re-habilitation of road from Gujranwala to Hafizabad km No.6/20 to 48/0, L=41.80 km, District Gujranwala and Hafizabad.
Cost: PKR 2021.285 million | Status: Deferred
Widening / Improvement of road from Ouderwal to Nila Road length 43.00 Km District Chakwal.
Cost: PKR 782.995 million | Status: Approved
Topographic Survey and Geotechnical Studies for Land Slinding Zonization of Murree Hill Area Mainly located between old Rawalpindi – Murree Road and Islamabad Murree Expressway in Murree (Amended)
Cost: PKR 202.600 million | Status: Approved
Establishment of Director General of Monitoring & Evaluation
Cost: PKR 827.031 million | Status: Approved