6th PDWP

ENERGY SECTOR

Preparation of Feasibility Studies, Financial Structure, Revenue Model and PC-I for Establishment of 150-200 MW Coal Fired Power Projects at Four (4) locations near Load Centers in Punjab. (PC-II)

Cost: PKR 68.065 million | Status: Deferred

Management of Bidding Process and Construction Supervision of 150-200 MW Coal Fired Power Projects at Four (4) Locations in Punjab. (PC-II)

Cost: PKR 498.094 million | Status: Deferred                                   

PPH SECTOR                                             

Sewerage Scheme Rahim Yar Khan City with Treatment Plant-Construction of Intermediate Sewage Pumping Station near Niazi Colony and Installation of Force Main, R.Y. Khan.

Cost: PKR 288.022 million | Status: Approved

EDUCATION SECTOR                                

Internal Merit Scholarships for EE / SE Students

Cost: PKR 600.000 million | Status: Approved

Provision of Laptops (2015-16)

Cost: PKR 5455.638million | Status: Deferred

LITERACY SECTOR                                   

Taleem Sab Kay Liye (TSKL)

Cost: PKR 351.524 million | Status: Approved

P&D SECTOR                                             

Restructuring / Revamping and Strengthening of Punjab Economic Research Institute.

Cost: PKR 250.000 million | Status: Approved

DISTRICT PROG. SECTOR                        

Establishment of Model Cattle Market Sammundri Road, Faisalabad.

Cost: PKR 320.777 million | Status: Approved

HEALTH SECTOR                       

Establishment of Blood Center at Faisalabad with Assistance of KFW.

Cost: PKR 388.789 million | Status: Approved 

National Blood Transfusion Service Project, Punjab.

Cost: PKR 276.919 million | Status: Approved

AGRICULTURE SECTOR

Optimizing Watercourse conveyance Efficiency through Enhancing Lining length.

Cost: PKR 9316.491 million | Status: Approved          

Provision of Laser Land Levelers to the Farmers / Service Providers on Subsidized Cost.

Cost: PKR 1350.00 million | Status: Approved

Lining of Watercourses Chak No.469/GB, Sammundri, District Faisalabad.

Cost: PKR 34.904 million | Status: Approved

50 Overseas PhD Scholarships for University of Agriculture, Faisalabad.

Cost: PKR 724.031 million | Status: Approved

Promotion of Agriculture Mechanization in Punjab.

Cost: PKR 1184.000 million | Status: Approved

GOVERNANCE & IT SECTOR                  

Punjab E-Gateway Project (E-Government Initiatives) (Revised)

Cost: PKR 1459.696 million | Status: Approved

ROADS SECTOR                                           

Construction / Rehabilitation of road from Haire to Sui-e-Asal length 15.30 km, Lahore.

Cost: PKR 378.152 million | Status: Approved

Rehabilitation of road from Raiwind to Pattoki length=44.20 kms, District Kasur.

Cost: PKR 600.000 million | Status: Approved

Construction of Flyover at Sublime Chowk on Sialkot-Wazirabad Road, Sialkot. (PC-II)

Cost: PKR 1339.901 million | Status: Approved

Dualization of Provincial Highway from Arifwala to Boundary of Bahawal Nagar, length=21.50 km in District Pakpattan.

Cost: PKR 962.986 million | Status: Approved

Widening / Improvement of Road from Khushab to Sandral, Rajar Road and Ahmad Abad Motorway Interchange, length 33.50 km, District Khushab.

Cost: PKR 457.473 million | Status: Approved

Widening / Improvement of road from Faisal Chowk to Darya Khan Road length 50.00 km, District Bhakkar.

Cost: PKR 1272.320 million | Status: Approved

Rehabilitation / Re-Construction of road from Faisalabad to Lahore Road alongwith Canal Bank length 28.47 km District Sargodha.

Cost: PKR 776.292 million | Status: Approved

Construction of Dual Carriageway from Teen Meela to Sanjwal length=4.50 km District Attock.

Cost: PKR 306.439 million | Status: Approved

Construction of mettled road from Awan Kot Choubora Road Adda Panwar Wala to Janay Wala via Adda Shumar Wala length= 30 km, Tehsil Choubara, District Layyah.

Cost: PKR 256.476 million | Status: Approved

Construction of M/Road from MM Road to Head Mast Ali via 456/TDA, length= 26.75 km, District Layyah.

Cost: PKR 220.725 million | Status: Approved

Construction of Mettled Road from Head Lal to Bangla Yasmeen via Sahran More Chak No. 451/TDA, 449/TDA, 447/TDA Patti Arain, length= 40.32 km, Tehsil Choubara, District Layyah.

Cost: PKR 337.494 million | Status: Approved

Widening and Improvement (Dualization) of road from Chak No. 97-M, Chamb More, Chamb Kaliar, Kaliar Chowk, Mughalanwala Chowk Sheikhu Pull to Khanwah Ghalwan, length= 20.00 km, District Lodhran.

Cost: PKR 328.066 million | Status: Approved

Dualization of Shahi Road from Rahimyar Khan to Chowk Bahadarpur (KLP Road) (length=12.20 km) Rahimyar Khan.

Cost: PKR 2670.391 million | Status: Approved

Widening & Improvement of road from Gojra Khidar Wala Road to Raja Chowk Tehsil Boundary via Chak No. 370 /JB (Ghania), Bye Pass, Chak No.49/GB (Chowinda) Chak No.178/GB (Gogha) and Chak No.242/GB (Noor Pur Basti) length=19.00 km, Tehsil Gojra, District T.T. Singh.

Cost: PKR 225.604 million | Status: Approved