Agriculture Sector |
Extension in Gestation period of the scheme “Human Resource Development for Improvement of Agriculture Extension system in Punjab” |
Cost: Issue | Status: Approved |
PPH Sector |
Water Supply Scheme Sadiqabad, Tehsil Sadiqabad District R.Y. Khan |
Cost: PKR 711.538 million | Status: Withdrawn/not discussed |
UD Sector |
Land Acquisition and Partial Development of Area Development Scheme Sheikhupura-II |
Cost: PKR 429.812 million | Status: Approved | ADP No.1566 (New) |
Widening of Canal Bank Road Underpass at Jail Road, Underpass Chobucha, and Remodeling of all Existing Underpasses |
Cost: PKR 8,504.555 million | Status: Approved |
Construction of Elevated Expressway alongwith Metro Bus Service (EEW & MBS) from Jail Road / Main Boulevard Gulberg to Ring Road Motorway M-2, Lahore |
Cost: PKR 5,719.000 million | Status: Approved |
DP Sector |
Establishment of Model Cattle Market Sammundri Road, Faisalabad |
Cost: PKR 277.752 million | Status: Deferred |
Construction of Dual Carriageway Approach Road from Barki Road to Aashiyana Housing Scheme, Lahore. (length = 2.278 Km, W= (24’+24’) Carriageway+ (12’+12’) Service Road |
Cost: PKR 578.254 million | Status: Approved |
Transport Sector |
Bus Terminal Cum-Commercial Complex at Railway Station, Lahore (PC-II) |
Cost: PKR 20.000 million | Status: Approved |
Regional Planning Sector |
Establishment of Zoo at Multan (PC-II) |
Cost: PKR 7.700 million | Status: Approved | ADP No.SPDP 681 (New) |
Dualization of Hasilpur-Bahawalpur Road (length=77.25 km), District Bahawalpur |
Cost: PKR 4,945.681 million | Status: Approved | ADP No. B. Allocation SPDP 681 (New) |
Public Buildings Sector |
Construction of High Security Prison in Southern Punjab (one at Sahiwal) |
Cost: PKR 1,032.905 million | Status: Approved | ADP No.1127 (on-going) |
Hiring of consultant for preparation of TORs / Bidding documents for International Bidding regarding Topographic survey and geotechnical studies for land sliding Zonization of Murree Hill area mainly located between old Rawalpindi-Murree Road and Islamabad Murree Expressway, in Murree. (PC-II) |
Cost: PKR 1.476 million | Status: Approved |
Roads Sector |
Dualization / Improvement of Golra Road from G.T. Road to Kashmir Highway Islamabad length=1.92 km, District Rawalpindi |
Cost: PKR 323.128 million | Status: Approved |
Dualization of Lahore-Faisalabad-Jhang-Bhakkar Road (Section Faisalabad By-Pass Sadar Chowk to Jhang City Phase-I) from km No.155.75 to 169.05, length=13.30 km |
Cost: PKR 987.315 million | Status: Approved | ADP No.879 (on-going) |
Feasibility Study for the project Dualization of Sheikhupura-Gujranwala Road, length 54.33 km (project length=44.8 km)(under PPP mode)PC-II
i. Section from km 3.90 to 14.65 length 10.75 km falls in Distt Sheikhupura.
ii. Section from km 14.65 to 48.70 length: 34.05 km falls in Distt Gujranwala
|
Cost: PKR 52.536 million | Status: Approved |
Dualization of Faisalabad – Sargodha Road from Faisalabad Byepass to Chiniot, length=20 km (under PPP mode) PC-II
i. Section from km 14 to 19.98 length 5.98 km falls in District Faisalabad.
ii. Section from km 19.98 to 34 length: 14.02 km falls in District Chiniot
|
Cost: PKR 18.983 million | Status: Approved |
Feasibility Study for the Project:- Dualization of Faisalabad Ring Road, length=98 km (PC-II) (under PPP mode) |
Cost: PKR 94.059 million | Status: Approved |
Duzalitation of Bahawalpur-Hasilpur-Bahawalnagar Road (section Hasil-Bahawalnagar), length 80-km (under PPP mode) PC-II |
Cost: PKR 81.482 million | Status: Approved |
Construction of Metalled Road from Bahawalpur-Hasilpur Road at km No.14 to Quaid-E-Azam Solar Park Lal Sohanra Via Chak No.5/BC (length:10.90 km) District Bahawalpur. (Revised) |
Cost: PKR 502.475 million | Status: Approved |
Widening / Improvement of Road from Vehari to Hasilpur length: 48.68 km in District Vehari / Bahawalpur |
Cost: PKR 1,044.764 million | Status: Approved | ADP No.830 (on-going) |
Widening / Improvement of Sher Shah Road from Aziz Hotel To Sher Shah Bye Pass, length 16.79 km in District Multan. (Revised) |
Cost: PKR 347.029 million | Status: Approved | ADP No.827 (on-going) |
Widening and Improvement of Tibba Sultan Pur to Luddan Road via Mitroo from km 9.35 to 43.40 & 44.80 to 65.25, L=54.50 Km I/C W/I of Link Road Karam Pur to Burana L=8.80 km total length of road 63.60 km in District Vehari |
Cost: PKR 1,017.028 million | Status: Approved | ADP No.831 (on-going) |