1 |
|
Feasib. Study Detailed Design Prepar. Const. of Housing Units in Housing Scheme Chishtian |
2 |
|
Feasib. Study Detailed Design Prepar. Const. of Housing Units in Housing Scheme Lodhran |
3 |
|
Feasib. Study Detailed Design Prepar. Const. of Housing Units in Housing Scheme Renala Okara |
4 |
|
Feasibility & Detailed Design for Augmentation of Water Supply Dadhocha dam |
5 |
|
Const. of Surface water treatment plantof 54 MGD at BRBD Canal near Ravi Syphon |
6 |
|
Const. Wid. Imp of Dry Port RWP |
7 |
|
Storm Water Drainage System for Haji Camp to River Ravi Laxmi Chowk, McLeod |
8 |
|
Feasibility for Rawalpindi Ring Road (PC-II) |
9 |
|
Updation of Feasibility, Detailed Engg Design, Prep. PC-I Waste Water Treatment Plants in WASA, GJW |
10 |
|
DEVELOPMENT OF MASTER PLAN FOR THE BAHAWALPUR CITY |